İnşaat Projelerinde Zaman Maliyet Ödünleşim Problemi: Örnek Olay Analizi

dc.contributor.authorUĞURAL, MEHMET NURETTİN
dc.date.accessioned2022-12-13T11:55:13Z
dc.date.available2022-12-13T11:55:13Z
dc.date.issued2020
dc.description.abstractThis is a very difficult challenge for project managers in today's competitive world to complete a project within time and budget. In this environment, one of the most important challenges faced by the project manager is to decide on the feasibility of the project by the desired quality standards within the time frame and the financial resources allocated to the project. The cost and time of the project always play a vital role in the decision of the construction projects. Project managers today are faced with constant pressures in terms of time and cost management. At this point, it is one of the most serious problems for project managers to work on how to make time and cost trade-offs and what kind of models to develop. The objective of the time-cost trade-off analysis is to reduce the duration of the original project at the lowest possible total cost. The main purpose of this study is to demonstrate, in a simply and understandable way, how the time of the project is reduced by the time-cost trade-off analysis of the project. Secondly, to determine the optimum point between time and cost. In this paper, critical path method is used to find out the duration and the cost of the crashing with heuristic method. The duration of the project activities is predicted to be deterministic. Regression analysis is carried out to identify the relationship between time and cost in order to formulate a quadratic model. The analysis reveals that through proper scheduling of all activities, the project can be completed within 13 weeks from estimated19 weeks. The problem is then solved by the MATLAB program, which has an optimum cost of at least 741.000 TL. with a duration of 17 to weeks.en
dc.identifier0
dc.identifier.citationUĞURAL M (2020). İnşaat Projelerinde Zaman Maliyet Ödünleşim Problemi: Örnek Olay Analizi. Avrupa Bilim ve Teknoloji Dergisi, 0(19), 460 - 465. 10.31590/ejosat.726891
dc.identifier.doi10.31590/ejosat.726891
dc.identifier.eissn2148-2683
dc.identifier.urihttps://doi.org/10.31590/ejosat.726891
dc.identifier.urihttps://hdl.handle.net/11413/8072
dc.language.isotr
dc.publisherOsman Sağdıç
dc.relation.journalAvrupa Bilim ve Teknoloji Dergisi
dc.rightsinfo:eu-repo/semantics/openAccess
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/
dc.subjectİnşaat Proje Yönetimi
dc.subjectKritik Yol Metodu
dc.subjectZaman Maliyet Ödünleşimi
dc.subjectHızlandırma
dc.subject/ Construction Project Management
dc.subjectCritical Path
dc.subjectTime-Cost Trade-Off Analysis
dc.subjectCrashing
dc.titleİnşaat Projelerinde Zaman Maliyet Ödünleşim Problemi: Örnek Olay Analizitr
dc.title.alternativeTime-Cost Trade-Off Analysis in a Construction Projects: Case Studyen
dc.typeArticle
dspace.entity.typePublication
dspace.relatedentity.typePerson
local.indexed.atTrDizin
local.journal.endpage465
local.journal.issue19
local.journal.startpage460
person.identifier.orcid0000-0002-8037-7603
relation.isAuthorOfPublicationdd14cf99-05d7-4852-b417-dbdb4c5fe8de
relation.isAuthorOfPublication.latestForDiscoverydd14cf99-05d7-4852-b417-dbdb4c5fe8de

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Tam Metin/Full Text
Size:
716.12 KB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.82 KB
Format:
Item-specific license agreed upon to submission
Description: